Current Projects
     
 

2004 NORTHERN DIVISION PG ENERGY BLANKET CONTRACT Linde Enterprises, Inc. received an award for the installation of gas distribution facilities under a Blanket Contract for the 2004 construction season.  This is an on-going project in which the Company is performing and providing all labor, tools, equipment, supplies, materials  and utilities to perform all work necessary or incidental to the construction of various gas distribution facilities at locations directed by PG Energy in their operating area.

     
 

2004 PENNSYLVANIA AMERICAN WATER BLANKET CONTRACT – Linde Enterprises, Inc. has been awarded a contract for the installation of ¾ inch through 2 inch new and renewed water services for Luzerne and Lackawanna Counties for the period January 1, 2004 through December 31, 2005. 

   
 

RIVERCREST WASTEWATER TREATMENT FACILITY – Linde Enterprises, Inc. has been awarded a contract for the additions and alterations to the Rivercrest WWTF in Wyoming County, PA.  The work includes installing new aeration equipment in both the treatment unit and the sludge holding tank, renewal of all yard piping and an exterior makeover to the control building including re-pointing the  block, installing a new roof and installation of new doors and windows.

     
  GREAT WOLF LODGE - Linde Enterprises, Inc. is currently performing a 2.5 million dollar site development contract for an exciting project in the Pocono Mountains in Tannersville, PA. The owner, The Great Lakes Companies, Inc., is constructing a 450,000 square feet, 400 unit Great Wolf Lodge under the direction of Kraemer Brothers, LLC, a construction management firm. Our work consists of grading, storm water management, utilities and erosion and sedimentation control. Upon completion the resort will consist of a four story wood framed structure, a 250 seat restaurant, a fitness center, a spa and an indoor water park.
   
 
MINOOKA INTERCEPTOR (Contract No. 8 Sanitary Sewers) - Linde Enterprises, Inc. has commenced work for the Scranton Sewer Authority to install a sanitary interceptor line to the treatment plant. This $800,000+ project is scheduled to be completed at the end of this fall.
   
  PP&L GAS UTILITIES CORPORATION - Lock Haven Transmission Line Upgrade - Our Gas and Water Division is currently installing approximately 5 miles of 12" steel gas transmission line including 4 directional bores, 2 of which are under the Susquehanna River, to replace a transmission line from Avis to Lock Haven, PA.
   
  Scranton Lackawanna Industrial Building Company (SLIBCO) - Phase I Infrastructure of Valley View Business Park in Jessup Borough, Lackawanna County, PA. This 1.5 million dollar project includes clearing and grubbing, grading, utility installation and road construction.
   
  WILKES-BARRE TOWNSHIP MARKET PLACE Linde Enterprises, Inc. is the Prime Site Contractor for approximately 375,000 sf of retail space on a 23-acre site development which includes a Wal-Mart  Super Center as the anchor store and a Wal-Mart Fuel Service Station.  Linde is working under EMJ Corporation of Boston, MA, the Construction Manager for the Project.  Work includes site grading, storm water, potable water, retaining walls, site lighting, curbing, paving, line painting, signage, dynamic compaction, fire protection loop, electric/telephone /cable utilities and the building pad for Wal-Mart.  Work has commenced and completion is scheduled for the Summer of 2003.
   
Completed Projects
     
 

ORWIGSBURG - - Linde Enterprises, Inc. has completed a $4,620,000 dollar project for the upgrade and expansion of a Wastewater Treatment Plant owned by the Municipal Authority of the Borough of Orwigsburg located in Schuylkill County.  Work included the construction of a new blower generator building, a three train vertical loop reactor, a cast-in-place aerobic digester, two new reed beds and the upgrading and expansion of the existing facilities.  This project combined the efforts of our concrete division with those of our mechanical/electrical division. 

     
  COVINGTON INDUSTRIAL PARK - Linde Enterprises, Inc. completed a site development project at the Covington Industrial Park including infrastructure, storm water facilities, potable water, wastewater facilities, paving and curbing. This project's first tenant was a Maytag Distribution Center.
     
 
KIDDER TOWNSHIP –  Linde Enterprises, Inc. installed a Wastewater Collection System around Lake Harmony for the Split Rock Wastewater Treatment Plant in Kidder Township.  This project commenced in April and took approximately a year to complete.  The designed system is a low pressure force main with grinder pumps utilized at all residences.  A large portion of the project was accomplished via directional boring.  This trenchless technology limits the inconvenience of construction inherent to a project performed in narrow confines.  In addition to this contract the company also performed the electrical work at the Wastewater Treatment Plant and three odor control stations.
     
  BEACH LAKE WASTEWATER TREATMENT PLANT - LEI recently completed a 1.4 million dollar project for the installation of a Wastewater Treatment Plant in the Village of Beach Lake in Berlin Township, Wayne County, PA. The project included construction of a 90,000 GPD wastewater treatment plant utilizing SBR technology housed in all cast-in-place concrete structures and associated appurtenances.
 
  WAYMART WIND FARM - Linde Enterprises, Inc. completed support site work at the Waymart Wind Farm for Prime Contractor D.H. Blattner, including ten miles of environmentally sensitive mountaintop land clearing and fast tracking off-site staging area. Forty three wind mills have been erected at the project site. Additionally, LEI furnished and installed a design/build Operations and Maintenance building with all associated site development which will house the SCADA controls and offices for on-site personnel.
     
  FRITO LAY DISTRIBUTION CENTER - Linde Enterprises, Inc. has completed a major site development project for a Frito Lay Distribution Center to be constructed in Moosic, PA. The work included site preparation, installation of storm, sanitary sewer, water, electric and gas utilities, construction of an underground detention system, erection of two segmental block retaining walls, concrete curb and paving.