• Our Work
  • Our People
  • Our Purpose
  • Let’s Talk

Linde

  • Our Work
  • Our People
  • Our Purpose
  • Let’s Talk

Sewer Treatment

Proud partner in modernizing our utilities for a cleaner environment

Linde has a long history in sewer treatment work. What began as small jobs in the 70’s took on a sense of urgency and greater purpose as towns in Northeastern Pennsylvania scrambled to take advantage of the expansion of the Clean Water Act in the 80’s. The company has installed numerous treatment-related facilities in the region. We are proud to be part of the modernizing of such crucial public services.

Sewer Treatment Services

Linde Corporation has a skilled mechanical/electrical team that provides emergency repair and regular maintenance services to utility providers throughout our region. Please contact us to discuss your needs.

 

  • Construction Management
  • Building Construction
  • Clear and Grub
  • Trench Excavation/Trench Protection
  • Core Hole Drilling
  • Underground Piping
  • Backfill
  • Restoration
  • Stainless Steel & PVC Treatment Pipe
  • Foundation Excavation
  • Pre-Packaged Treatment Set
  • Bypass Pumping
  • Grinder Pump Installation
  • Electro-Mechanical Construction
  • Sampling System Piping
  • Pressure Testing
  • Site Work
  • Aggregate Placement
  • Concrete Work

Related Projects

Geotextile Fabric

Relief for the Relief Wells Wyoming Valley

Wyoming Valley

The Army Corps of Engineers noticed water bleeding from underneath the dikes at some points in the Wyoming Valley during the record high waters of 2011. Linde was tasked with collecting that overflow.

View Project
Utility Pipe Complete

Mt. Carmel Pipeline Replacement Project 3rd Street Mt Carmel, Northumberland County, PA

3rd Street Mt Carmel, Northumberland County, PA

Third St. Mt. Carmel, PA, Northumberland county. On this project, Linde Corporation was hired to install 3800 lf (linear feet) of ductile iron pipe. In addition, the project specs called for 7 fire hydrants and 145 services to be added. This project was estimated to take 130 days from beginning to end. It was begun in June of 2011.

View Project
Plymouth Flood Clean-up

Flood Cleanup Plymouth Township, Luzerne County PA

Plymouth Township, Luzerne County PA

2011 was the wettest year ever recorded in Northeastern Pennsylvania. By the time the remnants of two tropical storms came calling in early fall, the ground was already saturated from the summer rains. The Susquehanna River crested at nearly 43 feet, its highest level ever. What follows are three Linde utility projects, each triggered by serious, water-related events in Luzerne County, Pennsylvania.

View Project

36 Inch Concrete Force Main Repair Kingston TWP, Luzerne County PA

Kingston TWP, Luzerne County PA

When a sewer pipe leaks it is serious business. When that pipe is 36” wide and located next to the Susquehanna River, it is immediate serious business. Linde was on-site to begin another project when we discovered the problem and alerted the Wyoming Valley Sanitary Authority. The timeline roughly went like this: Linde discovered the leak the morning of October 5th, the WVSA mobilized on the 6th and from October 7th until the 10th work went on around the clock.

View Project

Abrahams Creek Water Main Repair Wyoming Borough, Luzerne County PA

Wyoming Borough, Luzerne County PA

A water main break is always an emergency since we all need water dependably and safely delivered to our taps. When that water main break happens in the middle of a creek, the safety risk spreads from humans to the ecosystem surrounding the creek. It requires an immediate response.

View Project

Water Main Break River Street, Wilkes Barre, PA

River Street, Wilkes Barre, PA

Linde Corporation was called in by the Pennsylvania America Water Company (PAWC) to repair a 24” water main on River Street near the Wilkes-Barre General Hospital.

View Project

Hazleton Insertion Project Hazleton, Luzerne County PA

Hazleton, Luzerne County PA

This is a gas insertion project performed by Linde Corporation and under way in Hazleton. The concept here is to replace existing cast iron and steel pipe by inserting high density polyethylene—or HDPE pipe inside the old mains.

View Project

Larch Street Main Repair Scranton, Lackawanna County PA

Scranton, Lackawanna County PA

Linde repaired a broken water main on Larch Street in Scranton. Click on the link below to see a short video on the project Larch Street Project Video 2 from Linde Corporation on Vimeo.

View Project

Bethlehem Insertion Project Bethlehem, Northampton County PA

Bethlehem, Northampton County PA

Linde Corporation upgrades water mains in Bethlehem, Pennsylvania. To see more, go to the video link below:   Bethlehem Insertion Project from Linde Corporation on Vimeo.

View Project

Dallas Prison Dallas, Luzerne County PA

Dallas, Luzerne County PA

To see a short video on Linde’s Dallas Prison Project, click below Dallas Prison Project from Linde Corporation on Vimeo.

View Project

Stafford Ave Gas Line Relocation Scranton, Lackawanna County PA

Scranton, Lackawanna County PA

To see a short video on our project on Stafford Street in Scranton, click below.   Stafford St Video from Linde Corporation on Vimeo.

View Project

Our Work

  • Marcellus Shale
  • Utilities
  • Site Work
  • Rail Yard
  • Projects

Information

  • About Linde
  • Our People
  • Safety
  • News Room
  • Careers
  • Portal

Contacts

Linde Corporation
118 Armstrong Road
Pittston, PA 18640

570.299.5700

@ info@lindeco.com

Copyright 2018 Linde. All Rights Reserved.

Web Design by Sean Gove Design